Titan I 725-C Missile Silo Lowry AFB Colorado

Do you have a correction, comment, or story you would like to share about this location? Please tell us about it in the comments below.

Titan I 725-C

Squadron: 725th SMS

Date Activated: August 1st 1960
Date Deactivated: June 25th 1965

Air Force Base: Lowry
State: Colorado
Nearest Town: Elizabeth

Coordinates:
Latitude: 39°18'17.24"N
Longitude: 104°33'50.22"W
Decimal:

Latitude: 39.315407
Longitude: -104.564738

GPS:
Latitude: 39 18.2873333333333
Longitude: -104 33.837

View on Google Maps

3 silos
Former Titan I Missile Complex with the 725th Strategic Missile Squadron

Read about the Titan I at Lowry AFB

List of all Titan I site Coordinates

Detailed information about the Titan I Intercontinental Ballistic Missile can be found here.

Map showing location of Titan I 725-C Missile Silo Lowry AFB Colorado
Map showing location of Titan I 725-C Missile Silo Lowry AFB Colorado

Map showing location of Titan I 725-C Missile Silo Lowry AFB Colorado
Map showing location of Titan I 725-C Missile Silo Lowry AFB Colorado

Overview

Titan I Missile Complex 725-C was one of six hardened intercontinental ballistic missile installations built around Lowry Air Force Base and one of three assigned to the 725th Strategic Missile Squadron. The complex occupied rural Elbert County land about four miles south of Elizabeth, Colorado. It was one of only two Lowry Titan properties acquired outside the former Lowry Bombing and Gunnery Range. Beneath a sparse surface compound were three missile silos, three equipment terminals, three propellant terminals, a shared launch control center, a powerhouse, an antenna terminal, two guidance-antenna silos, utility spaces, protected entrances, and connecting tunnels. Three HGM-25A Titan I missiles could be held on strategic alert, loaded with liquid oxygen when required, raised from their silos, and launched from the surface.

Complex 725-C has an unusually broad documentary record. The Historic American Engineering Record identifies its location, land acquisition, construction contract, operational milestones, and post-military county use. The U.S. Supreme Court's 1967 decision in Neely v. Martin K. Eby Construction Co. preserves the circumstances of a fatal construction fall in an Elizabeth missile silo. Federal environmental records identify the property as Lowry AFB S-2 (Complex 2C), FUDS property B08CO0012, legacy federal facility identifier CO89799F694600, and EPA site CO0010104266. The same property later supported a county landfill and solid-waste transfer station, linking Cold War military engineering with a long and still active environmental history.

Titan I Complex 725-C field relationships
Graphic showing Complex 725-C in the Lowry Titan I field and its later county and federal restoration relationships.
The operational phase lasted only about three years. The 725th received its complexes on May 4, 1962 and became operational on May 10. Its first missile came off alert on February 17, 1965, the last alert weapon on April 1, and the final squadron missile was shipped on April 8. The complex then passed through equipment removal, salvage, disposal planning, county acquisition and use, groundwater investigation, and continuing federal restoration. The site's modern importance therefore extends beyond the original weapon. It is also a case study in construction safety, difficult reuse of hardened underground facilities, landfill interaction with defense contamination, and the long duration of environmental responsibility.

Installation Identity, Location, and Boundaries

Several names describe the same military property. Strategic Air Command used 725-C, meaning the C complex of the 725th Strategic Missile Squadron. Engineering records used Site 2C, Complex 2C, Lowry Complex 2C, Titan Site 2C, or the Elizabeth complex. Environmental programs use Former Lowry AFB Titan Missile Site 2-2C, Lowry AFB S-2 (Complex 2C), and the Ponderosa name. These are chronological or administrative aliases, not separate installations. The property was never Lowry Air Force Base proper, was not within the former bombing and gunnery range, and should not be confused with 725-A near Bennett or 725-B near Deer Trail.

Land approval in October 1958 covered 52 acres acquired in fee and 29 acres under permanent access easement. Those interests total 81 acres if added arithmetically, but they should not be collapsed into a single 81-acre operating compound. The easement supported access and associated rights, not necessarily fenced military occupancy. A 2015 Army Corps fact sheet describes a 97-acre complex acquired between 1959 and 1961 and says Titan complexes covered 30 to 60 acres. Those numbers describe different administrative and physical scopes. This history preserves all three measures instead of forcing them into one false parcel figure.

Agency sources identify Elbert County as the post-military owner and the surface use as a solid-waste transfer station, preceded by county landfill operations. That evidence does not establish the current tax parcels, deed restrictions, operating footprint, environmental covenant limits, or access rights for any underground space. Public use of a county waste facility is not permission to explore a buried missile installation. The coordinate and map graphics are therefore identification aids only and deliberately omit routes into the underground plant.

The Elizabeth Landscape Before 725-C

Complex 725-C stood outside the former Lowry Bombing and Gunnery Range in rural land south of Elizabeth. The Air Force selected the area because it offered open terrain, relatively low population density, road access, and sufficient separation from the other Lowry launch complexes. The position remained within the operating radius of Lowry and the Denver-area Martin plant while extending the 725th Squadron field southward. Separate land acquisition was required because the government did not already control the property as part of the bombing range.

The distinction is important for both history and cleanup. The property did not inherit the former range's broad bombing and gunnery mission or its dispersed munitions footprint. Its primary defense legacy arose from Titan construction and operation: diesel power, hydraulic machinery, RP-1 fuel, liquid oxygen support, acids and caustics used in system maintenance, solvents, electrical equipment, wastewater systems, clarifiers, sumps, and later dismantling. County landfill trenches added a separate post-military activity whose environmental effects must be distinguished from Air Force sources.

The southern location contributed to strategic dispersal. A broad geographic spread made it less likely that one enemy weapon could destroy all nine launchers of the 725th Strategic Missile Squadron. That survivability came at an operational cost. Crews, security forces, maintenance teams, test equipment, replacement parts, and supplies had to travel between Lowry and a remote county site in all seasons. The complex therefore depended on Lowry for organization and logistics while generating its own power and supporting a complete authenticated launch sequence underground.

Strategic Origins of Titan I

Titan I emerged from the American effort to place a dependable intercontinental ballistic missile force on alert before the Soviet Union could gain a decisive strategic advantage. The Air Force developed Titan alongside Atlas so that a major failure in one program would not leave the country without an ICBM. Titan used a rigid, load-bearing airframe and two liquid-propellant stages. Its long range, nuclear payload, and rapid flight time changed strategic planning by allowing distant targets to be threatened within about half an hour, but the first version still required substantial ground machinery and preparation before launch.

Survivability drove the move underground. A surface launch pad, exposed control building, and visible fuel plant were vulnerable to attack, sabotage, and weather. The Titan I complex placed its missiles, crew, communications, power, guidance, and propellant-support equipment in reinforced structures linked by flexible tunnels and isolated with blast doors. Dispersing three complexes across each squadron field further reduced the chance that one enemy weapon could disable all nine launchers. This architecture made 725-C a hardened combat installation rather than a simple storage site.

Titan I nevertheless retained major first-generation limitations. RP-1 kerosene could be stored, but cryogenic liquid oxygen could not remain indefinitely aboard the missile. Before launch, crews had to load oxidizer, complete system checks, open the silo doors, elevate the fueled missile above ground, and raise a guidance antenna. The missile then depended on ground radio guidance during early flight. Titan II and Minuteman eliminated much of this vulnerability through storable propellants or solid fuel, launch-from-silo operation, and improved guidance. Complex 725-C is valuable precisely because it preserves the transition between exposed launch pads and later self-contained silos.

Site Selection and the Lowry Network

The Air Force selected Lowry for the first operational Titan I deployment in January 1958. Proximity to the Glenn L. Martin Company's Denver-area plant was a major advantage because the manufacturer could support installation, modification, testing, and troubleshooting. Lowry Air Force Base already supplied technical training, administration, housing, maintenance, transportation, and logistical infrastructure. The nearby range provided space for dispersed launch sites without requiring the Air Force to create an entirely new support base.

Initial planning expanded quickly. Within about two months of the first squadron decision, the Air Force added a second Lowry Titan squadron. The 724th Strategic Missile Squadron controlled complexes 1A, 1B, and 1C, while the 725th controlled 2A, 2B, and 2C. Each complex supported three missiles. The two squadrons therefore gave the 451st Strategic Missile Wing eighteen operational launchers, plus a spare or maintenance missile within squadron support arrangements. Their broad geographic separation made the field harder to destroy and placed unusual demands on roads, secure communications, maintenance dispatch, weather response, and crew transportation.

Lowry Air Force Base remained the parent organization and logistical hub, but 725-C had to function independently during alert. Wing headquarters coordinated target assignments, readiness, personnel, maintenance priorities, security policy, and higher-command communications. Missile maintenance and technical specialists traveled between Lowry and the remote complexes. Inside 725-C, redundant electrical generation, water, ventilation, communications, food, sanitation, and protected workspaces allowed the crew to remain underground if outside conditions became dangerous. The site was simultaneously a dependent satellite of Lowry and a self-contained nuclear command post.

Design, Contracting, and Construction

Preliminary work began in 1959 with surveys, access roads, drainage, wells, power preparation, and excavation planning. The Lowry field's ceremonial groundbreaking occurred on May 5, 1959. The Omaha District of the Army Corps of Engineers administered the construction program. Morrison-Knudsen and its joint-venture partners received the second-squadron contract for complexes 2A, 2B, and 2C in June 1959. Denver-area subcontractors performed excavation, electrical, guidance, and other specialized work, while the Glenn L. Martin Company later installed and checked missile-support equipment.

The contract for all three second-squadron complexes began at $26,944,820. HAER records 210 modifications adding $17,058,789 and producing a revised total of $44,003,609, an increase of 63.3 percent. Those are group-contract amounts and must not be presented as the cost of 725-C alone. Across the six Lowry complexes, construction contracts rose from about $72.5 million to $115.3 million. The growth reflected concurrent development: missile tests, blast criteria, shock isolation, liquid-oxygen tank changes, equipment revisions, incomplete drawings, labor disputes, and safety discoveries repeatedly altered work already underway.

Construction required excavating an enormous open plant before backfilling concealed it. Each launcher branch included a silo, equipment terminal, propellant terminal, and tunnels connected to the central control, power, guidance, and utility core. Reinforced concrete structures had to fit elevators, blast doors, piping, cables, tanks, ventilation, pumps, controls, and shock mounts within close tolerances. Once the earth cover was restored, only doors, vents, hatches, roads, security features, and other surface elements revealed the scale of the underground installation.

The Elizabeth construction record includes the only fatality specifically identified in the HAER account of the Lowry program. A worker serving as Night Silo Captain for Sverdrup and Parcel fell 130 feet inside a silo. The later Supreme Court record states that he worked on suspended concrete blocks and had to cross from a wooden platform that left horizontal and vertical gaps. A railing on one side required a diagonal jump of about three feet or a climb over the railing. After another worker crossed and attached his safety belt, the victim attempted to follow, fell headfirst through the opening, and died at the bottom of the silo.

The accident should not be reduced to a dramatic anecdote. It documents the hazards of building a structure far below grade while multiple contractors, engineers, and trades worked around incomplete platforms and large openings. HAER attributes the death to a badly designed scaffold arrangement. The Supreme Court decision records the allegations, testimony, trial verdict, appellate reversal, and procedural issue that reached the Court. It does not supply a complete accident investigation, and this history does not treat the judicial result as a technical safety finding.

Titan I Complex 725-C construction safety record
Evidence diagram showing the scaffold dimensions described in Neely v. Martin K. Eby Construction Co. It is not a scene reconstruction.
Main construction was substantially complete by fall 1961, but an operational weapon required much more than finished concrete. The Lowry Site Activation Task Force coordinated installation, testing, correction, training, and acceptance. Contractor Technical Acceptance Demonstrations exercised countdown and propellant-loading functions. Strategic Air Command crews then repeated operational demonstrations under contractor supervision. The site could be transferred only when structures, communications, power, guidance, safety interlocks, propellant equipment, elevators, doors, and trained personnel functioned together.

Underground Design and Surface Layout

Complex 725-C followed the standardized Lowry Titan I arrangement. No measured drawing or complete as-built survey made specifically for 2C was located. HAER CO-89 measured drawings document the closely related 725-A complex and its data history confirms that 2C belonged to the same three-site second-squadron contract. The standard configuration is therefore a strong engineering analogue, but it is not a surveyed plan of the Elizabeth property and cannot establish the current position, depth, condition, or accessibility of every buried feature.

Titan I Complex 725-C standard underground layout cutaway
Verified standard Lowry Titan I configuration used to explain Complex 725-C. The drawing is an engineering interpretation, not a surveyed 725-C as-built plan.
A protected entry portal led through a blast-resistant access sequence toward the central junction. The shared core contained a two-level launch control center, a two-level powerhouse, water and utility spaces, an antenna terminal, and two retractable radio-guidance antenna silos. Flexible tunnel sections, shock isolation, and blast doors limited the transfer of ground motion. Diesel generators, switchgear, ventilation, cooling, compressed air, communications, food, water, and sanitation allowed the crew to maintain alert operations if outside utilities or surface access were interrupted.

Three launcher branches radiated from the core. Each branch passed through an equipment terminal and a propellant terminal before reaching a missile silo. The equipment terminal supported the launcher elevator, doors, monitoring, and servicing. The propellant terminal contained RP-1 and liquid-oxygen support equipment, pumps, valves, piping, and controls. The silo was a reinforced vertical shaft with massive paired doors and an elevator that raised the missile into its exposed launch position.

The antenna terminal supported two redundant retractable guidance antennas. Titan I used inertial equipment but depended on ground radio corrections during early flight. During launch preparation, an antenna rose through surface doors and transmitted guidance information. Redundancy reduced the chance that one damaged antenna or mechanism would prevent the launch system from guiding a missile. The guidance installation, orientation targets, electronics, cabling, and power support were therefore primary weapon components rather than ordinary base communications.

The Army Corps fact sheet describes three launch stations, each with a silo, equipment terminal, propellant terminal, and propellant system; one underground guidance center; an underground powerhouse and utilities; connecting tunnels; two sewage stabilization cells; a chemical-waste clarifier; and five sealed concrete chambers. The powerhouse held four diesel generators and hydraulic machinery. Sump discharges served each silo, the antenna terminal, and the central complex. These waste and drainage features later became important in interpreting contaminant pathways.

Once the complex was backfilled, the surface presented a misleadingly simple appearance. Security fencing, patrol and access roads, launcher doors, antenna doors, vents, hatches, orientation targets, lagoons, and service features occupied open ground. The later landfill and transfer-station use further altered the surface. A modern aerial image may show the general footprint but cannot reveal the condition of tunnels, floors, water, doors, confined spaces, or contaminated media. Site graphics therefore distinguish documentary relationships from present engineering fact.

Missile, Propulsion, Guidance, and Launch

The HGM-25A Titan I was a two-stage liquid-propellant missile approximately 98 feet long. Both stages burned RP-1 kerosene and liquid oxygen. A nuclear reentry vehicle gave the missile its strategic effect, while engines, airframe, inertial components, radio guidance, communications, and launch equipment came from a national contractor network. At 725-C, these elements operated as one system. The missile could not fulfill its mission without the site's power, oxidizer plant, elevators, doors, antennas, crew, and authenticated command link.

Liquid oxygen governed readiness. Its extremely low temperature and continual boil-off prevented long-term storage aboard the missile, so the launch sequence included oxidizer loading. Crews treated oxygen equipment as surgically clean because oil, dirt, or incompatible material could cause fire or explosion. HAER interviews describe cleanliness standards below 150 microns, pressurized clean rooms, vapor degreasing, caustic cleaning, black-light inspection, and repeated checks. Liquid nitrogen, high-pressure nitrogen and helium, diesel fuel, hydraulic fluid, lubricants, batteries, and other industrial materials added more hazards.

Propellant Loading Exercises tested every missile on a roughly 90-day cycle, which meant approximately one exercise each month at a three-launcher complex. The procedure forced operations and maintenance personnel to verify tanks, pumps, lines, valves, sensors, timing, and emergency actions under conditions approaching a real countdown. These exercises were essential because Titan I's deterrent value depended on machinery that normally remained idle. They also placed sustained demands on the environmental, safety, and waste-handling systems later examined during cleanup.

A launch order required authenticated messages and controlled cooperation by trained crew members. Once the sequence began, the system loaded liquid oxygen, checked missile and site status, opened the selected silo doors, raised the missile on its elevator, deployed a guidance antenna, and completed ignition preparations. The three missiles could be launched in sequence. Titan I was dramatically faster than an aircraft-delivered weapon, but the fueling and elevation process left it more exposed and slower to respond than the later Titan II and Minuteman systems that launched directly from closed, fueled or solid-propellant silos.

Organization, Crews, and Maintenance

The 703rd Strategic Missile Wing activated in September 1958 to organize the developing Lowry force and was redesignated the 451st Strategic Missile Wing in 1961. The 725th Strategic Missile Squadron activated on August 1, 1961 and operated complexes 725-A, 725-B, and 725-C. The wing also included the 724th Strategic Missile Squadron, the 451st Missile Maintenance Squadron, and headquarters organizations required to support eighteen launchers. On April 30, 1962, the wing reported 170 officers and 1,107 airmen; the 725th accounted for 43 officers and 73 airmen.

Strategic Air Command maintained enough combat-ready crews to rotate alert duty, evaluation, training, leave, and contingencies. The Lowry wing generally required 26 to 30 crews across the field. Two-person control, personnel-reliability requirements, authenticated communications, detailed checklists, recurring evaluations, maintenance controls, and armed security governed nuclear weapons and launch systems. No source reviewed identifies a uniquely named 725-C crew or site commander, so individual experiences recorded at another Lowry complex are not transferred here.

Daily life combined extreme consequence with long routine. Crew members monitored consoles, tested communications, inspected status indicators, maintained logs, reviewed emergency procedures, ate, rested, and waited for an order they hoped would never arrive. Maintenance teams entered the plant for scheduled work and troubleshooting. At a site roughly forty-two miles from Lowry, road conditions, weather, transportation, and relief schedules were operational factors. The underground plant functioned simultaneously as a weapon, power station, communications center, maintenance facility, and temporary living space.

Maintenance was demanding because Titan I combined cryogenic oxygen, stored kerosene, high-pressure gases, complex hydraulics, mechanical elevators, massive doors, radio guidance, and early digital or electromechanical control equipment. A problem in any of those systems could remove a launcher from alert. Squadron and wing organizations therefore depended on technicians who understood individual components and their interactions. The result was an installation that could appear quiet on the surface while supporting continuous testing, inspection, maintenance dispatch, and readiness reporting.

Activation and Strategic Alert

By fall 1961, principal construction was largely complete and missiles, ground equipment, and crews moved through installation and checkout. All eighteen Lowry Titan I missiles were reported in their silos by May 1, 1962. The 725th Squadron's three complexes were turned over to Strategic Air Command on May 4, and the squadron became operational on May 10. Construction completion, equipment acceptance, missile emplacement, site turnover, unit operational status, and the alert condition of an individual launcher were separate milestones.

No documented flight test from 725-C was found. The March 15, 1962 launch described in HAER occurred at 725-A, not at Elizabeth. Complex 725-C underwent the technical demonstrations and readiness work required for acceptance, but this history does not assign 725-A's launch event, its continuing training-center role, or its Cuban Missile Crisis eyewitness account to 725-C. The absence of a separate launch story does not lessen 725-C's operational purpose. It contributed three live launchers to the 725th Squadron's deterrent force.

Readiness required more than storing missiles underground. Crews verified command circuits, target and guidance data, electrical power, environmental controls, elevators, doors, propellant equipment, communications, and emergency actions. Propellant Loading Exercises placed the launch system through a near-operational cycle on a recurring schedule. Maintenance teams corrected discrepancies while wing controllers balanced individual launcher work against alert requirements across the eighteen-missile Lowry field.

During the Cuban Missile Crisis in October 1962, Strategic Air Command increased readiness and protected its ability to retaliate. The available site-specific record does not describe an event unique to 725-C, so the history states the squadron-level context without inventing a local episode. The crews at Elizabeth nevertheless occupied a real alert installation during the most dangerous nuclear confrontation of the Cold War. Their mission was to preserve an authenticated launch capability while preventing accidental, unauthorized, or premature action.

Phaseout, Deactivation, and Disposal

Titan I became obsolete quickly because Titan II and Minuteman offered faster response, reduced surface exposure, simpler alert maintenance, and launch-from-silo capability. Secretary of Defense Robert McNamara announced the phaseout of the remaining first-generation Atlas and Titan I force on November 19, 1964. The decision did not instantly close 725-C. Strategic Air Command had to sequence alert withdrawal, protect nuclear material, drain and make systems safe, remove classified components, and preserve readiness elsewhere.

The 725th's first missile came off alert on February 17, 1965. The final alert weapon was withdrawn on April 1, and the last squadron missile was shipped on April 8. The 725th Strategic Missile Squadron inactivated on June 25. These dates replace the earlier inventory's simplified March 26 closing date, which belongs to the companion 724th Squadron's final alert chronology. Combat termination, final missile shipment, unit inactivation, property disposal, and later county use are separate events.

Deactivation proceeded in phases. Phase I removed reentry vehicles, missiles, classified components, propellants, and gases. Missiles moved through Lowry before shipment to Norton Air Force Base in California. Phase II removed or salvaged equipment, including computers, hydraulic machinery, generators, piping, transformers, propellant hardware, and furnishings. Phase III placed the property into the General Services Administration disposal process. The immense buried concrete plant remained because demolition or conversion cost far more than removing selected equipment.

Early planning considered a survivable reconnaissance data-processing center in the Elizabeth complex after Titan deactivation. The concept reflected continuing interest in hardened facilities, while a separate plan considered a space-tracking station at 725-A. No evidence located shows that the Elizabeth data-processing center was installed or operated.

Elbert County Ownership, Landfill, and Transfer-Station Use

By the time of the HAER study, Elbert County used 2C as a solid-waste transfer station and had previously used part of the property as a landfill. HAER states that waste was placed in trenches rather than in the missile silos. The Army Corps fact sheet likewise identifies county ownership and transfer-station use. This surface reuse did not convert the underground plant into a public facility. The county was authorized to use the surface, while official activity in the underground complex was restricted.

The reuse illustrates why abandoned missile complexes posed difficult property problems. Surface acreage could support roads, waste handling, storage, or other county functions, but the specialized underground structures offered little economical civilian utility. Silos, tunnels, blast doors, contaminated water, mechanical remnants, and confined spaces created liability rather than ordinary usable floor area. Salvage recovered some equipment, but it did not eliminate the buried concrete network.

County financial records from the 2010s refer to a Titan Missile Complex obligation and show that related debt was retired by 2018. Those records help confirm a formal county property relationship but do not define the current facility boundary or underground rights. The latest site-specific federal fact sheet located dates from 2015. This history therefore describes county ownership and transfer-station use as agency-documented facts while leaving present operating arrangements, hours, contractors, and exact parcel details for current local confirmation.

Landfill history complicates environmental interpretation. Chlorinated solvents in groundwater may originate from military maintenance, post-military landfill trenches, or more than one source area. Investigators therefore evaluated contaminant distributions rather than assuming that every detection came from the Titan mission. Federal summaries distinguish PCE in the northwest part of the site, potentially related to Department of Defense activity, from TCE detected between wells near landfill trenches, which may indicate a landfill source.

Titan I Complex 725-C environmental relationships
Documentary diagram showing reported PCE, TCE, landfill-trench, and residential-well relationships. It is not a current concentration or plume map.

Environmental Investigation and Response

The former complex entered the Department of Defense Formerly Used Defense Sites program as Lowry AFB S-2 (Complex 2C), property B08CO0012 and legacy FFID CO89799F694600. EPA catalogs it as Former Lowry AFB Titan Missile Site 2-2C under EPA ID CO0010104266. EPA places the site outside the National Priorities List, identifies it as a federal facility, and classifies the work as other cleanup activity with a federal-facility lead. EPA also records an Eligible Response Site exclusion. These are regulatory classifications, not statements that every part of the property is clean, safe, open, or suitable for unrestricted excavation.

Chemicals known to have been used at Titan I complexes included ethylene glycol, sodium hydroxide, sulfuric acid, lubricating oil, diesel fuel, helium, liquid oxygen, liquid nitrogen, RP-1 kerosene fuel, polychlorinated biphenyls, and chlorinated solvents. Clarifiers, lagoons, drains, and five sump-discharge locations collected or moved wastes from the three launcher areas, antenna terminal, and central plant. Investigation therefore had to consider soil, shallow groundwater, deeper water, landfill trenches, sumps, wastewater features, and possible migration toward off-site wells.

The Army Corps reported two principal environmental investigations by 2015. The greatest potential human-health pathway identified in that summary involved drilling or excavation that could bring people into contact with contaminated shallow soil or groundwater. Investigators assessed the extent of tetrachloroethene, or PCE, and found it in the northwest portion of the site, where the source might relate to Department of Defense activity. Trichloroethene, or TCE, between wells near landfill trenches suggested that the trenches could be a source. TCE also raised concern for residential wells east of the property.

An archived Colorado environmental summary adds useful chronology. It reports PCE and TCE below drinking-water standards in one off-site domestic well early in the investigation, followed by non-detect results in 2006. Five domestic wells sampled in July 2008 were also reported non-detect. Modeling did not identify a significant indoor-air risk in off-site residences. An additional on-site well was installed in October 2008, and results were incorporated in an April 2009 remedial-investigation addendum. These older findings should not be mistaken for a current universal water-quality guarantee.

The 2014 remedial investigation recommended more work. The Army Corps planned further 2015 investigation to delineate the shallow PCE plume and proposed finalizing a feasibility study in 2016 before remedial design if needed. Department of Defense fiscal-year 2023 reporting continued to list one Installation Restoration Program site in investigation, no cleanup or post-cleanup sites, no Military Munitions Response Program site, and projected final response complete in fiscal year 2032. The projected year had changed from fiscal year 2034 in an earlier report, demonstrating why it must be treated as a planning estimate rather than a fixed completion date.

No current site-specific federal table later than the fiscal-year 2023 report was located, although the Department of Defense now publishes newer program-wide tables. EPA's profile remains active and identifies federal-facility-led cleanup. The responsible statement is therefore that investigation and response planning continued in the latest site-specific federal record found. This history does not claim that the project is complete, that groundwater restrictions have ended, or that county operations remove the need for environmental controls.

The environmental history also shows why source attribution matters. PCE in the northwest area may reflect defense practices, while TCE near landfill trenches may reflect county waste disposal. The two explanations are not mutually exclusive, and contaminants can migrate after release.

Surviving Features and Documented Condition

Federal descriptions state that the original complex included three reinforced launch stations, the shared guidance and control core, a powerhouse, utilities, tunnels, sewage cells, a chemical-waste clarifier, and sealed chambers. HAER reported that the underground missile complex apparently remained in place when it described county surface use. Salvage and later activity removed equipment and altered openings, while landfill and transfer-station operations changed the surface setting. No current comprehensive engineering survey of every underground structure was located.

The county-use record does not establish that the silos or tunnels are accessible, maintained, or structurally sound. Public waste-transfer activity occurs at the surface and under local operating controls. Underground missile spaces can contain deep shafts, incomplete floors, standing water, deteriorated stairs and steel, confined atmospheres, industrial residues, electrical or mechanical debris, and difficult rescue conditions. Environmental restrictions on drilling, excavation, groundwater use, and intrusive activity may apply even when a surface area is in routine county use.

The launcher doors, antenna areas, access features, or other surface traces may remain visible in aerial imagery, but visibility does not establish condition or permission. Exact fence lines, transfer-station operating limits, underground access controls, groundwater conditions, and surviving equipment require current official confirmation.

Titan I Complex 725-C illustrated history timeline
Illustrated timeline of Complex 725-C from land acquisition and construction through alert service, county reuse, and continuing restoration.

Detailed Chronology

  • 1954 The Eisenhower administration authorizes Titan development as a parallel ICBM program to Atlas.
  • 1956 The Glenn L. Martin Company develops Denver-area Titan production and test facilities.
  • January 1958 The Air Force selects Lowry for the first operational Titan I deployment.
  • Early 1958 A second Lowry Titan squadron is added, requiring three more dispersed complexes.
  • September 25, 1958 The 703rd Strategic Missile Wing activates to organize the Lowry Titan mission.
  • October 1958 Land acquisition for Complex 2C is approved: 52 acres in fee and 29 acres under permanent access easement.
  • Early 1959 Survey, road, drainage, well, utility, and site-preparation work begins across the Lowry field.
  • May 5, 1959 Ceremonial groundbreaking marks the Lowry Titan construction program.
  • June 1959 Morrison-Knudsen and its partners receive the principal contract for complexes 2A, 2B, and 2C.
  • 1959-1961 Complex 2C is constructed south of Elizabeth under a program affected by labor disputes, the steel strike, winter work, and continuing design changes.
  • Construction period A Sverdrup and Parcel Night Silo Captain falls 130 feet to his death in a 2C silo after attempting to cross from an incomplete scaffold platform.
  • 1960 The Lowry Site Activation Task Force assumes responsibility for integrating structures, equipment, testing, correction, and acceptance.
  • 1961 The 703rd Strategic Missile Wing is redesignated the 451st Strategic Missile Wing.
  • August 1, 1961 The 725th Strategic Missile Squadron activates.
  • Fall 1961 Main construction is substantially complete; installation, correction, demonstrations, and acceptance continue.
  • May 1, 1962 All eighteen Lowry Titan I missiles are reported installed in their silos.
  • May 4, 1962 The 725th Squadron's three complexes are turned over to Strategic Air Command.
  • May 10, 1962 The 725th Strategic Missile Squadron becomes operational.
  • October 1962 The Lowry Titan force assumes heightened readiness during the Cuban Missile Crisis.
  • 1962-1965 Complex 725-C maintains three Titan I launchers as part of Strategic Air Command's continuous nuclear-alert force.
  • November 19, 1964 Secretary of Defense Robert McNamara announces phaseout of the remaining first-generation Atlas and Titan I force.
  • February 17, 1965 The first 725th Squadron Titan I is removed from alert.
  • April 1, 1965 The final 725th Squadron missile comes off alert.
  • April 8, 1965 The last missile is shipped from the 725th Squadron.
  • June 25, 1965 The 725th Strategic Missile Squadron inactivates.
  • 1965-1966 Reentry vehicles, missiles, classified components, propellants, gases, and selected equipment are removed; salvage and disposal follow.
  • Mid-1960s planning Strategic Air Command considers a survivable reconnaissance data-processing center at the Elizabeth complex, but no implemented successor mission is verified.
  • March 20, 1967 The Supreme Court decides Neely v. Martin K. Eby Construction Co., a federal civil-procedure case arising from the 2C construction fatality.
  • Late 1960s onward The federal government disposes of the property while the specialized underground structures remain.
  • Post-military period Elbert County acquires the site and uses surface land for solid-waste purposes.
  • Before 2005 The county uses trenches at the property as a landfill; available records state that waste was not placed in the missile silos.
  • By 2005 HAER identifies 2C as an Elbert County solid-waste transfer station and notes that official county activity was confined to the surface.
  • 2006 Follow-up sampling of an off-site domestic well reports no detected PCE or TCE after earlier low-level detections.
  • July 2008 Five sampled domestic wells are reported non-detect for the identified chlorinated solvents.
  • October 2008 An additional on-site monitoring well is installed.
  • April 2009 A Final Remedial Investigation Addendum reports results of the additional investigation.
  • 2014 A remedial investigation recommends further work.
  • 2015 The Army Corps plans additional delineation of the shallow PCE plume and publishes a site fact sheet documenting county transfer-station use.
  • 2016 The Army Corps proposes completing a feasibility study and proceeding to remedial design if needed.
  • Fiscal year 2023 reporting Department of Defense lists one IRP investigation, no MMRP site, and a projected fiscal year 2032 final response complete date.
Current Google Satellite Image of Titan I 725-C Missile Silo Lowry AFB Colorado
Aerial View: Current Google Satellite Image of Titan I 725-C Missile Silo Lowry AFB Colorado Source: Google Maps - Click to View

Map Showing 725th Strategic Missile Squadron Titan I Missile Silo Locations
Map 3: Map Showing 725th Strategic Missile Squadron Titan I Missile Silo Locations Red Marker Shows 725-C Location, Black shows the other Silos in the Squadron

Sources & References


Do you have a correction, comment, or story you would like to share about this site? Please tell us about it in the comments below.